Kitchen renovation wiring in Ottawa: counter outlets, appliance circuits and the island

Send the new layout and the appliance list. One independent Ottawa electrical company gets your request and calls you to price the wiring.

Get a free quoteFree to send · one local company calls you

Get a free quote

Takes a minute. One local company calls you back.

When
Any phone format, an email, or both

In short

  • ESA's October 2026 bulletin: along the counter wall, no point may be more than 900 mm from an outlet.
  • A fixed island or peninsula with counter space of at least 600 mm by 300 mm needs an outlet; a movable island needs none.
  • HomeStars puts new wiring for larger renovations in Ottawa at $2,500–$6,000+.

Typical prices in Ottawa

JobTypical rangeNotes
New wiring for a larger renovation, Ottawa$2,500–$6,000+HomeStars Ottawa electricians page
Outlet installed or replaced, Ottawa$150–$250 eachSame HomeStars Ottawa page
New dedicated circuit$200–$500One Ottawa firm’s published list, February 2026
Dedicated 240 V outlet for a stove$250–$800HomeStars Canada-wide 2026 guide
Pot light, installed$150–$300 per lightHomeStars Canada-wide lighting guide
200 A panel upgrade$1,500–$4,500HomeStars Canada-wide 2026 guide, permit included

Sources. HomeStars, Electricians in Ottawa, cost section, seen 29.10.2026. HomeStars, Electrician Hourly Rate in Canada: 2026 Guide, updated 21.08.2026, seen 29.10.2026. HomeStars, Cost to Install Lights, updated 21.08.2026, seen 29.10.2026. One Ottawa firm’s published list: Why does my breaker keep tripping, published 24.02.2026, seen 29.10.2026. Rules: ESA Bulletin 26-23-8, Receptacle requirements in kitchens of dwelling units, issued October 2026; ESA Bulletin 26-18-15, AFCI and GFCI, ESA Bulletin 26-29-6, Replacement and alterations, ESA Bulletin 2-3-19, Notification not required, ESA Flash 25-16-FL, kitchen split receptacles and ESA Flash 25-05-FL, knob and tube, all May 2025; ESA, Notifications and inspections, ESA, Finding the right contractor and ESA, Aluminum wiring, seen 29.10.2026. City: City of Ottawa, Building permit projects and Projects not requiring building permits, seen 29.10.2026. Contracts: Ontario, guide for home renovation businesses, seen 29.10.2026.

Six kinds of circuit in one kitchen

An electrician prices a kitchen circuit by circuit:

  • Counter outlets, 15 A split or 20 A (CSA 5-15R split or 5-20R in ESA’s bulletin).
  • The fridge, on at least one branch circuit for the fridge receptacles (Rule 26-654 in ESA’s bulletin).
  • The range, cooktop or wall oven at 240 V. Spec sheets list the supply each needs.
  • Built-ins: dishwasher, garburator, a cabinet or over-range microwave, the hood fan.
  • Lighting: pot lights, island pendants, under-cabinet strips. See pot lights.
  • Open-concept walls, which get outlets like any living room.

The counter: 900 mm, islands and peninsulas

ESA’s Bulletin 26-23-8, issued October 2026, sets out how the counter rule is read. Along the wall behind the counter, no point may be more than 900 mm from an outlet, measured along the wall line. Wall behind a sink or cooktop, and counter sections under 300 mm, need none.

Each fixed island or peninsula with continuous counter space of at least 600 mm by 300 mm needs one outlet. If a sink or cooktop splits the top into two spaces that each meet that size, it needs two. A back-wall outlet along the counter run that a peninsula attaches to does not count for the peninsula. A standalone peninsula can take its outlet on the wall above it.

An island or peninsula outlet can go on a raised backsplash or partial wall behind the counter, in the countertop in a certified assembly that never faces up, or on the side or end as high as practicable, such as within 300 mm of the top. The kick plate does not count. ESA’s reason: most counter appliances ship with a 900 mm cord.

Arc-fault and ground-fault protection

Ontario’s code calls for combination-type AFCI protection on 125 V outlet circuits of 20 A or less in a home. In the kitchen, ESA exempts the counter, island and peninsula outlets and the fridge circuit. The outlets for a dedicated microwave, dishwasher, garburator or gas range are covered, and so are open-concept walls.

ESA’s knob-and-tube notice lists, for newly installed receptacles, that kitchen receptacles within 1.5 m of a sink shall be GFCI protected. Ask which of yours fall inside that distance, and whether protection sits in the panel or at the outlet. More on GFCI and AFCI protection.

ESA, the City, and the drywall date

ESA says anyone hired for electrical work in a home must be an LEC, and whoever does the work files the notification. The wiring must be inspected before it is concealed, so the rough-in inspection lands between the electrician and the drywall crew. Give the company your drywall date.

The building permit is a City matter. Replacing kitchen cabinets is on the City of Ottawa’s list of projects exempt from a permit, provided plumbing fixtures stay in place. Moving the sink alters the plumbing, and adding or removing walls is a structural change; both need a permit.

Older Ottawa kitchens

  • Split outlets. They come in no GFCI version, so ESA’s 2025 flash notice sets out a breaker route and an outlet route.
  • Panel size. HomeStars’ Canada-wide guide notes that houses with 60 A or 100 A panels often need a 200 A upgrade before a large kitchen renovation. The sizing logic is on 100 A or 200 A.
  • Aluminum wiring. ESA says houses built between the mid-1960s and late 1970s may have it, and some insurers will not provide or renew coverage on it.

What moves the price

Within the $2,500–$6,000+ Ottawa band, the total follows:

  • New circuits. One Ottawa firm lists a dedicated circuit at $200–$500; HomeStars’ Canada-wide guide puts a 240 V stove outlet at $250–$800.
  • Outlet count, set by the 900 mm rule, the island and the peninsula.
  • Lighting count, at $150–$300 a pot light in HomeStars’ Canada-wide guide.
  • Distance to the panel. HomeStars’ Canada-wide lighting guide puts new wiring at $6–$8 per foot when new circuits are needed.
  • Closed walls. Holes cut in finished drywall add patching.

What the quote should list

Each circuit by name, outlet types, box counts for the island, peninsula and under-cabinet spots, fixtures and who supplies them, panel work on its own line, drywall patching in or out, the ESA notification, and HST. ESA says a contractor’s 7-digit ECRA/ESA licence number appears on its estimates. In Ontario, a contract over $50 needs a written agreement, a bill can exceed an estimate by 10% at most without a signed change, and a contract signed at home has a 10-day cooling-off period.

Who you are dealing with

Ottawa Electric Desk passes your request to one independent local electrical company. That company calls you back, goes over the kitchen plan, prices the wiring and does the work if you agree on the price.

Questions to ask the company

  1. How many counter circuits do you plan, and will the outlets be 15 A split or 20 A?
  2. Which appliances get their own circuit, and is the range circuit in this price?
  3. Will my panel carry the new kitchen, or does the price assume a panel upgrade?
  4. When is the ESA inspection, relative to my drywall date, and is the fee included?
  5. Can I have the total with HST in writing, by circuit and fixture, before you start?

Have this ready for the call

  • A sketch with the sink, range, fridge, dishwasher and island marked, plus counter lengths
  • Spec sheets for the new range, wall oven or cooktop
  • A photo of the panel door label and the breakers, cover left on
  • The dates for demolition, cabinet delivery and drywall

Questions people ask

Does a movable island need an outlet?

ESA’s bulletin applies the island rule only to an island fastened to the floor. A movable one needs no outlet, and ESA states no rule requires an island to be fixed in place.

Can counter outlets go under the upper cabinets?

Yes. ESA accepts outlets facing down under the cabinets, as close as practicable to the wall, where a mirror or stainless backsplash leaves no room.

Can the beverage fridge share the fridge circuit?

In the kitchen, yes: ESA allows a mini-fridge, beverage cooler or freezer on the fridge circuit.

We are only swapping appliances. Does that need an ESA notification?

ESA’s Bulletin 2-3-19 exempts a Licensed Electrical Contractor (LEC) replacing a dishwasher, cooktop, oven or garburator on an existing circuit of up to 30 A and 240 V in an owner-occupied home. New or altered wiring needs a notification, and so does work in a rental unit.

Our old counter has split outlets. Can they become GFCI?

Split outlets come in no GFCI version. ESA’s May 2025 notice gives two routes: a 2-pole Class A GFCI breaker, or a tamper-resistant GFCI outlet on each line of the existing three-wire circuit.

Areas we take requests from

Requests come from across the City of Ottawa. These areas have their own pages with local notes.

Map of Ottawa neighbourhoods we take requests from Gatineau, Quebec Ottawa River Kanata Stittsville Barrhaven Riverside South Manotick Nepean Westboro Centretown The Glebe Vanier Alta Vista Hunt Club Gloucester Orléans Greely

Tell us the job. A local company calls you back.

Ottawa Electric Desk is an independent request service. Jobs are done by independent local companies we pass your request to.

Get a free quote